The deck is positioned on the mine floor during the drilling operation. A mast-type roof drilling unit is mounted on the front of the deck and includes a vertically movable drill pot for advancing a rotating drill rod into the mine roof for drilling a bore hole therein. ![]() An elevating mechanism pivotally connects the deck to the body portion for vertical movement of the deck into and out of position on the mine floor.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |